Jump to content

Paste Your Clipboard


nohpee°

Recommended Posts

FOUNDATIONS

Foundations to match existing and to be confirmed by building inspector prior to commencement of construction. The minimum depth of foundation from finished external ground level should be 750mm or if shrinkable subsoil is encountered a minimum of 1000mm.

Foundations to be designed by a structural engineer if adverse soil conditions are found, any irregularity in soil conditions to be reported to agent for immediate advice.

(Y) Just general work stuff.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...