Jump to content

Ali At Work


Mark W

Recommended Posts

From here.

One of the perks of this job is the access to the indoor trials course we have here at Tarty HQ which can soften the blow of rainy, cold evenings. Unfortunately, due to the amount of building work that one Al Fel has put in, there's a load of 'stuff' of various kinds over the majority of the trials course. However, the new office has opened up a few new lines that Ali took care of yesterday. As an added bonus, and to help gauge the height of the drop, we put up the Trials-Forum Tape Measure. Enjoy...

post-91-1254310007_thumb.jpg

And to please the Health and Safety inspectors, Ali avoided the dangerously nail-filled rubble with a gap to pallet stack.

post-91-1254310000_thumb.jpg

Massive white balance fail on the first pic, sorry!

Link to comment
Share on other sites

Can't remember if the EXIF's still there, but that was shot at about 8pm or something last night! Anal f**ked the power so we were behind so we could lock up, plus I found a bit of space to twat out a few pallets on the open bit of the warehouse. Raining last night, so it was all the riding we could do. Proper trials course 'badgering' today though :)

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...